FCC upper C-band: draft order text, not a final decision
As the brief logged it
A Techtimes piece (published 2026-07-03) framed the FCC as having already "finalized" upper C-band auction rules and "blocked" SpaceX's D2D request. Verification against Light Reading, SpaceNews, Via Satellite, and Communications Daily shows this is a draft order/fact sheet released July 1, ahead of the already-known July 22 Open Meeting vote — no Commission action has occurred. Notably, the draft reportedly proposes clearing 160 MHz (not the previously floated 180 MHz) — if confirmed, that matches SES's own June 18 FCC ex parte ask (Nancy Eskenazi, SVP Global Legal & Regulatory) to cap the clearing size at 160 MHz to preserve transponder capacity, alongside SES's separately-disclosed ~$3.6B C-band transition/clearing cost estimate (SES + Intelsat). Some press coverage lumps SES in with SpaceX and "QQ Technology" (a corrupted reference to OQ Technology, a real Luxembourg NB-IoT/D2D operator) as having a D2D carve-out request declined in the draft — this claim is unconfirmed and likely a conflation; SES's own documented ask in this docket is about capping clearing size, not seeking D2D spectrum (SES's D2D exposure runs through its separate Lynk Global/Omnispace stake). Recommend retro (a) note the possible 160MHz-not-180MHz detail as a partial win for SES's position if independently confirmed at the July 22 vote, and (b) do not carry forward the "SES sought D2D carve-out" claim without a primary-source check.
Provenance
Logged in the brief of 4 July 2026.
Raw brief ↗ (repository access)