← Back to Fleet

Starlink (SpaceX LEO) — Scope & Funding Ledger

The evidence base behind starlink.json. Reconstructed by reading the SpaceX primary record chronologically — Farrar/TMF's July-2026 Starlink profile (the backbone, itself quoting the S-1, FCC filings and SpaceX progress reports), the Aug-4-2026 Q2 earnings-call transcript, Farrar's Aug-4 note on the Q2 print, and the spacex-financial-architecture dossier's 10-Q series. Every figure carries a dated quote and a HARD/SOFT tag — HARD = SpaceX official / S-1 / 10-Q / call / FCC order; SOFT = Farrar (TMF) or analyst estimate. Unsourced figures are flagged, not adopted.

Last reconstructed: 2026-08-14 · Currency: USD throughout (no cross-currency issue, unlike Lightspeed).


1. Generation / fleet evolution — reconciled

The satellite design (bus/mass) is distinct from the constellation (FCC license) it flies into — §1 tracks the bus, §2 the license.

Gen (bus)MassFirst flightPer-sat capacityTag
V0.9simplifiedMay 2019none (never commercial)HARD
V1.0260 kg (app said 386)Nov 201917–23 Gbps claimed / 8–10 realizedmass HARD, realized SOFT
V1.5~300 kg (adds crosslinks)2022~8–10 Gbps realizedHARD
V2 mini~800 kg → cut to ~575 kg (spring 2025)Feb 202396 Gbps nominal / ~50 realizedHARD nominal
V3up to 2,000 kg (Starship)late 2026 / operational Flight 141 Tbps down / 160 Gbps upHARD design figure
Mobile / Direct-to-Celldedicated bus, 350 kmJan 2024 test; 650-sat set complete Jun 2025D2DHARD

Current in-orbit (2026-06-30), HARD (Shotwell, Aug-4 call): "our constellation … grew to roughly 10,200 with our 9,600 broadband satellites delivering roughly 800 terabits per second of total downlink capacity." Implied ~600 mobile/DTC (10,200 − 9,600) — implied, not stated; flagged. Farrar's model (SOFT) puts service sats at 10,813 (2025) → 12,286 (2026) — a projection, not the HARD count.


2. FCC authorization evolution — the notional ceiling

DateSystemScopeTag
Nov 2016Gen1 Ku/Ka4,425 (1,600 initial)HARD
Mar 2017V-band7,518 (later subsumed as Gen2 payloads)HARD
May 2020Gen2 applied30,000HARD
Dec 2022Gen2 partial grant7,500 @ ~500 kmHARD
Jan 2026Gen2 expanded15,000, altitude 530→480 km (DA-26-36)HARD
Jul 6 2026Gen3 filedup to 100,000HARD (a filing, not a grant)
Jan 2026AI / "Starmind" filedup to 1,000,000 orbital-data-center satsHARD (a filing)

Ceiling target (SOFT): Shotwell (Mar 2026) named 15K–20K V3 as the practical maximum. The 100,000 / 1,000,000 numbers are filings — see §6.


3. Capacity — nominal ≫ saleable ≫ carried

Capacity: nominal ≫ saleable ≫ carriedTbpsThe 800 Tbps headline is launched-nominal, not deliverable revenue capacity
Nominal (launched)
800 Tbps
Saleable
58.9 Tbps
Carried (peak)
5.6 Tbps
Carried ≈ 3% of nominal — peak 5.6 Tbps from 2.3M+ customersas of 2026-06-30Shotwell Aug-4 call (nominal, HARD); TMF saleable (SOFT); carried HARD-derived

Headline capacity falls off sharply from nominal to saleable to carried — the 800 Tbps figure is gross launched capacity, not deliverable revenue capacity.

System totalHARD
~800 Tbps nominal downlink from 9,600 sats — gross launched capacity, not saleable throughput.
LaunchedHARD · S-1
">~700 Tbps launched by end 2026Q1."
SaleableSOFT · TMF
~41.5 Tbps (2025) → 58.9 Tbps (2026).
CarriedHARD-derived
peak 5.6 Tbps from 2.3M+ customers = ~3–3.5% of nominal. The 800 Tbps headline is not deliverable revenue capacity.

Per-gen capacity: nominal figures far exceed realized, and V3's 1 Tbps is a design figure not yet demonstrated at scale.

V2 miniHARD · S-1
96 Gbps nominal.
V2 miniSOFT
~50 realized.
V3HARD
1 Tbps design (not yet demonstrated at scale).
mechanismCALL
Musk: V3 "an order of magnitude more capable … 2 order of magnitude increase in delivered bandwidth."

4. Capex / revenue / profitability timeline

SpaceX group: revenue, capex, profit$BStarlink is 62–63% of capex and the profit engine funding it
RevenueCapexProfit
$0.47B$7.97B$15.5B202320242025
Starlink revenue alone: $3.9B → $7.6B → $11.4B over the same windowas of 2025-12-31SpaceX S-1 (HARD), group excl. xAI

SpaceX group (excl. xAI), S-1 — HARD ($M):

202320242025
Revenue7,42611,39515,473
Capex3,9525,5308,010
Profit4682,0273,766

Starlink is the dominant share of SpaceX group capex.

2023HARD · S-1
62% ($2,455M) of group capex.
2024HARD · S-1
63% ($3,498M) of group capex.
2025SOFT
Starlink satellite capex ~$4.36B for "just over 3,000 satellites."
cumulativeHARD
"over $10B invested to date" (Shotwell, Aug 2024).

Starlink revenue growth and FY25 operating profit.

revenue ($M)S-1 · SOFT
3,869 (2023) → 7,599 (2024) → 11,387 (2025) → 4,291 (2026 Q2).
FY25 op profitHARD · S-1
$4.4B.

Q2 2026 Connectivity segment is the only profitable segment, funding Space and AI losses.

revenue10-Q · CALL
$4.3B (+66% YoY); Consumer $2,485M / Enterprise & Gov $1,806M; operating income $1.66–1.7B (+79%); adjusted EBITDA $2,597M (+64%).
mechanismHARD
Connectivity is the only profitable segment, funding Space (−$542M) and AI (−$1.26B) losses.
scale10-Q · CALL
Subs 12M ($66 ARPU, 167 markets); backlog $47.5B.
capex10-Q · CALL
Space $1,174M / Connectivity $1,367M / AI $15,828M — Starlink's own capex is now a minority of group capex.

5. Launch — vehicles, packing, cadence

Falcon 9: 650+ launches; commercial price raised to $74M (Mar 2026); 165 launches in 2025. Starlink-dedicated launches/yr (Farrar): 63 (2023) → 90 (2024) → 122 (2025). H1 2026 (HARD, Shotwell): "78 total launches and 1,041 tons … primarily … internal Starlink." Packing: up to 56 V1.5 → 20–23 V2 mini (800 kg) → ~29 (575 kg); V3 on Starship (Flight 13 = 20 test units). V3-at-scale threshold (Musk): "~1,000 … approximately second quarter next year [2027]."


6. FUNDED / operational vs NOTIONAL

FUNDED / in-service — committed, operational programs, all HARD.

fundedHARD
Gen1 + Gen2 (15,000 auth) — ~10,200 operational.
fundedHARD
Mobile/DTC 650-sat set live since Jun 2025.
fundedHARD
EchoStar spectrum (~65 MHz, DA 26-471; ~$19.6B consideration, $856M paid in Q2) contracted.
fundedHARD
Q2 revenue/EBITDA all HARD.

NOTIONAL — filed or aspired, no committed program.

Gen3NOTIONAL
Gen3 (100,000) — a Jul-2026 filing, not a grant, not funded; Farrar calls it "demand-unjustified."
StarmindNOTIONAL
AI / "Starmind" (1,000,000) — a filing; zero signed orbital commercial contracts; two prototypes NET early 2027.
V3 at scaleNOTIONAL
V3 broadband at scale — Starship-dependent; Farrar: "'V3 at scale on Starship' has stayed ~12 months out for nearly three years." Significant V3 broadband capacity is a ~2028 event in the SOFT base case.
Mobile V2NOTIONAL
Mobile V2 + EchoStar terrestrial build-out — satellites fly "next year"; terrestrial network unbuilt, capex explicitly withheld ("I'm not going to talk about the CapEx for that right now").

7. Honest gaps — flagged, not adopted

Enterprise/gov/mobile split is not disclosed — Farrar's finer split is his estimate.

disclosedHARD
only Consumer $2,485M / Enterprise & Gov $1,806M.
FarrarFLAG · SOFT
finer split (Enterprise $761M, Mobile $160M, Gov $885M) is his estimate.

~600 mobile sats is implied (10,200 − 9,600), not stated.

scaleFLAG
implied by 10,200 − 9,600, not stated.

800 Tbps is nominal, not saleable — saleable ~40–60 Tbps; carried ~3% of nominal.

saleableFLAG
saleable ~40–60 Tbps; carried ~3% of nominal.
realizedFLAG · SOFT
realized per-sat throughput is Farrar.

V3's 1 Tbps is a design figure, not demonstrated in operational orbit.

V3FLAG
1 Tbps is a design figure, not demonstrated in operational orbit.

Aug-11 "~11,000 sats / 13M subs" is an internal all-hands video, unfiled.

2026-08-11FLAG
"~11,000 sats / 13M subs" — internal all-hands video, unfiled.
anchorHARD
anchored figures remain the Jun-30 10-Q/call (10,200; 12M).

Starlink standalone capex/FCF beyond 2023–24 is TMF-modeled.

disclosedHARD · S-1
the S-1 gives the segment capex split only for 2023–24.
modeledFLAG · SOFT
2025's $4.36B and forward FCF SOFT.

What this maps to in starlink.json

The fixture's verdict is disclosed free cash flow — Q2 Connectivity adj. EBITDA ($2,597M) minus segment capex ($1,367M) = +$1.23B, self-funding, published, needing no assumption. The modeled IRR rides an estimated cumulative capex, so it stays withheld. Cost/sat (~$1.4M) and the internal marginal launch $/kg are Farrar/un-anchorable — consistent with §4/§7 here.