Weak signal · 17 July 2026
Weak signal

SDA "Golden Dome" tracking-layer awards are a confirmed, multi-cycle desk gap.

On 2026-07-14 the Space Development Agency awarded ~$1.75B combined to L3Harris ($955M, 18 sats) and Sierra Space ($798M, 18 sats) for Tranche 3 Accelerated Missile…

1 in 271 items swept clears the bar·Brief of 17 July 2026, 06:49 UTC

The desk logged this but did not push it. A weak signal sits below the bar for a lead item — it is watched, not yet acted on.

The desk's note

What the desk actually logged against this signal. SES sign-in required.

Open the note →

Share this signal

Paste the link on its own line and a preview card appears.

Download the card ↗
See the full archive →